No. 04The Inlay · Omnira SignalOnline

Commercial construction project leads

A large commercial job pulls its building permit.

On the record

$20,480,184,796

in building permits, one value per job site

Where
13 of the largest US cities and counties, 60 days
Same pull
$13,144,621,072 of it private work
Pulled

The moment

The weeks after a big permit issues are when the crane, the hoist, the formwork, the concrete package, the glazing and the builder's risk get ordered. The permit names the reported cost and, in most cities, the general contractor.

The catch is that every big city publishes permits its own way. The Inlay tracks thirteen of the country's largest permit markets on the same days and counts each job site once, so one tower doesn't show up as six separate permits.

Who it's for

  • Equipment rental, crane and hoist companies
  • Ready-mix, rebar and structural steel suppliers
  • Formwork, shoring and scaffold rental
  • Glazing, curtain wall and elevator contractors
  • Builder's risk, wrap-up and surety brokers
  • Site security, fencing and temporary power
  • Mechanical, electrical and fire subs bidding big jobs

What you get

  • Every private job site of $250,000 or more in the window, at one value per site
  • The general contractor, where the city names one
  • The reported cost and the work described
  • Airport, campus, public and national-prime jobs set aside, so your list is private work you can sell into
  • A grade on every site

The outcome

Your rental desk and your estimators work the same list: private jobs, sized, with a name to call. You're in front of the GC while the package is still being bought out.

Questions buyers ask

Which cities does it cover?
New York, Los Angeles, Chicago, Houston, Austin, Seattle, San Francisco, San Diego, Denver, Boston and Nashville, plus Miami-Dade and Mecklenburg counties. All thirteen are read on one shared window so the numbers line up.
Is the reported cost the final number on the job?
No. It's the cost the applicant wrote on the permit. We count it once per site, because the same cost often gets copied onto several permits for one job.
Why are public jobs left off?
Airports, school districts, campuses and city projects buy through their own bid process, and national primes bring their own supply chains. Those sites stay in the total. They just don't go on your call list.

Related machines

Four ways to work with the Index

  1. 1

    Free

    Signal Sample

    Pick an industry and a state. We'll show you this week's count and a preview of the records.

  2. 2

    Your territory

    Signal Brief

    Your whole territory, every record in it, with an analyst's read on what it means for your pipeline.

  3. 3

    On a schedule

    Signal Feed

    The same records, refreshed on a schedule you set and delivered straight into your CRM.

  4. 4

    Built for you

    Signal Desk

    A machine built around your market, and an analyst who runs it with your team.

See your market in the Index.

Tell us what you sell and where. We'll show you this week's count and the first records, free.