Building permit leads for trades and suppliers
A building permit issues, naming the contractor, the address and the work.
$1,046,221,148
in reported cost on jobs with a trade still to bid. Chicago, 60 days.
A large commercial job pulls its building permit.
$20,480,184,796
in building permits, one value per job site
The weeks after a big permit issues are when the crane, the hoist, the formwork, the concrete package, the glazing and the builder's risk get ordered. The permit names the reported cost and, in most cities, the general contractor.
The catch is that every big city publishes permits its own way. The Inlay tracks thirteen of the country's largest permit markets on the same days and counts each job site once, so one tower doesn't show up as six separate permits.
Your rental desk and your estimators work the same list: private jobs, sized, with a name to call. You're in front of the GC while the package is still being bought out.
A building permit issues, naming the contractor, the address and the work.
$1,046,221,148
in reported cost on jobs with a trade still to bid. Chicago, 60 days.
A commercial or apartment job gets its permit, months before the finishes are bought.
$3,930,260,623
in building permits, one value per job site. Los Angeles, 90 days.
A roof, impact window, door or shutter permit issues in hurricane country.
$4,180,609,126
in permits, one value per property. Miami-Dade County, 90 days.
Pick an industry and a state. We'll show you this week's count and a preview of the records.
Your whole territory, every record in it, with an analyst's read on what it means for your pipeline.
The same records, refreshed on a schedule you set and delivered straight into your CRM.
A machine built around your market, and an analyst who runs it with your team.
Tell us what you sell and where. We'll show you this week's count and the first records, free.